Full kitchen
€6,000-€12,000
Bespoke units, silestone or dekton worktop, sink, taps, basic integrated appliances. Build time 4-6 weeks.
Verified trade network · permit management · weekly remote supervision for non-resident UK/IE owners. NOT a builder — your single point of contact.
We are NOT a builder. We do not have an in-house crew. We coordinate your renovation with a verified Costa del Sol trade network and act as your single point of contact. These are the four functions we take on — particularly valuable for non-resident UK/IE owners managing remotely.
Survey + fixed-price written quote
Free technical visit, complete property survey, detailed renovation plan and fixed-price written quote before any commitment. No visit fee. No mid-build surprises. 14-day cooling-off period applies under the Spanish General Consumer Defence Act (Ley General Defensa Consumidor).
Building permit management
We file the appropriate permit (obra menor minor works by prior notification or obra mayor major works requiring a stamped architect project) at the Málaga, Torremolinos, Benalmádena or Fuengirola town hall. Power of Attorney with Hague Apostille can be used for non-resident remote signing. No coordination charge.
Verified trade network
We contract masonry, plumbing, electrical, HVAC, carpentry, painting, flooring, kitchens, bathrooms and home automation with crews we vet individually. All Spanish trades carry current Seguro de Responsabilidad Civil (contractor liability insurance) — we verify the policy before signing each subcontract. The NIE is required for invoicing.
Weekly remote supervision
We visit the site every week, control progress by verifiable milestones, photograph each stage and send a written report by email. For non-resident UK/IE owners we call you before every key decision. Currency staged payments coordinated via TorFX, Currencies Direct, Wise, OFX or IFX for milestone transfers EUR/GBP.
How a Costa del Sol home looks after a coordinated full renovation
Indicative costs as of May 2026 for an average Costa del Sol apartment of 80-120 sqm. The fixed written quote is confirmed after a free technical visit, based on finish level, structural scope and zone.
€6,000-€12,000
Bespoke units, silestone or dekton worktop, sink, taps, basic integrated appliances. Build time 4-6 weeks.
€3,000-€6,000
Sanitary ware, shower screen, wall + floor tiling, taps, vanity unit. Build time 1-2 weeks per unit.
€25-45 /sqm
AC4 laminate, SPC vinyl or wood-effect porcelain. Includes removal of existing floor and substrate levelling.
€25-40 /sqm
Full rewire: consumer unit, USB sockets, LED recessed lighting, halogen-free cabling. Spanish electrical certification included.
€20-35 /sqm
Multi-layer pipe renewal, hot water (ACS) installation, drains, sanitary ware and taps. Aerothermal compatible.
€8-12 /sqm
Substrate preparation, anti-mould plastic and matt finish. Includes furniture protection and clean handover.
€350-700 /unit
Thermal-break aluminium or PVC carpentry with double-glazed low-emissivity panes. Lifts EPC rating and improves comfort.
€6,000-€10,000
Inverter heat pump for heating + cooling + hot water. On the cooling-heavy Costa del Sol climate this is the best energy investment.
€1,500-€4,000
Motorised blinds, smart thermostat, dimmable lighting, app control. Optional per preference.
Costs exclude Spanish VAT. 10% reduced VAT applies for renovation of the owner's habitual residence; 21% general VAT applies for commercial premises, second residences and holiday-let (VFT) properties.
Administrative fees (building permit + technical project where required) add €250-€1,200 and are paid directly to the town hall — NOT a coordination charge. Figures are indicative pending on-site survey. EUR/GBP currency staged payments coordinated via TorFX, Currencies Direct, Wise, OFX or IFX.
Each profile has its own urgency, target finish level and expected return. We coordinate your renovation with integrated property-cycle vision — the trade network and the calendar adapt to your real situation.
You have bought an outdated apartment at a 10-25% discount to the zone average and need a single coordinator for the post-purchase renovation. We advise from before completion on realistic target cost and timeline.
Your primary or secondary residence needs updating: kitchen, bathrooms, services, windows, climate. We coordinate works in phases if you wish to remain in occupation. Common UK retiree scope: electrical rewiring + plumbing upgrade + insulation + double glazing + bathroom modernisation.
Buy · renovate · sell within a 6-9 month cycle. We coordinate all three phases under a single bilingual point of contact: identifying the right outdated apartment, renovating to the neighbourhood specification and professional sale presentation.
Renovate to lift the EPC rating and maximise long-term rental (LAU) or holiday-let (VFT) income. We coordinate the renovation with premium-pricing vision and post-works EPC re-issue.
Typical timelines as of May 2026 for a full renovation of an 80-120 sqm Costa del Sol apartment. Cosmetic refresh drops to 3-5 weeks. Structural major-works rises to 14-20 weeks plus permit time.
Phase 1 · Advisory + quote · 1-2 weeks
Technical visit + survey + renovation plan + fixed-price written quote with category breakdown. We define finishes from samples, structural scope and trade calendar. Remote video walkthrough available for non-resident owners.
Phase 2 · Permit + trade contracts · 2-8 weeks per scope
We file the building permit (obra menor 2-4 weeks · obra mayor with architect project 4-8 weeks). We close subcontracts with each trade in the verified network and plan the build calendar. POA Hague Apostille used when non-resident owner cannot sign in Spain.
Phase 3 · Build + weekly supervision · 4-20 weeks per scope
Execution by verifiable milestones. Kitchen 4-6 weeks. Bathroom 1-2 weeks per unit. Full 90 sqm flat 8-12 weeks. Structural major-works 14-20 weeks. Weekly site visit + photographic report to client. Currency staged payments coordinated for non-resident milestone transfers.
Phase 4 · Handover + warranties · Immediate handover
Handover with post-works cleaning + installation manuals + warranties formalised in writing: 1 year on finishes, 3 years on installations, 10 years on structural elements when major works applied (Spanish Building Act 38/1999).
The distinction between obra menor and obra mayor determines whether you need an architect + stamped technical project or a simple prior notification. These are the four key facts as of May 2026 in Costa del Sol.
Renovation that does NOT affect structure, layout or facade: paint, flooring, sanitary ware, kitchen and bathroom without moving walls. Prior notification to town hall. Resolved in 2-4 weeks. Fee €250-450 per municipality.
Renovation affecting structure, layout, facade or common areas. Requires stamped architect technical project + major-works permit. Resolved in 4-8 weeks. Fee €800-1,200 by surface area.
NOT required for minor works. MANDATORY for major works under the Spanish Building Act 38/1999. The architect signs the technical project, directs the works on site and is legally liable for the 10-year structural warranty.
Minor works can start after prior notification (some town halls allow immediate start). Major works require waiting for the permit before the first strike. Plan these timelines into your overall renovation calendar — particularly important for non-resident owners coordinating remote travel.
We operate from Torremolinos across Benalmádena, Fuengirola, Mijas, Marbella and Málaga city, and we cost the work the way a seller would: which upgrades come back at resale on that street, and which never do.
We coordinate the renovation with our own verified trade network — zero subcontractor surprises.
Spanish-law contractual warranties 1/3/10 years formalised in writing. We respond as single point of contact: never defer to the responsible trade.
For non-resident UK/IE owners we supervise remotely and send a weekly written report with photos. Contractor liability insurance (Seguro Responsabilidad Civil) verified for every trade we engage.
We coordinate the application for Next Generation EU PRTR funds (40-80% subsidy for residential energy improvements with a ≥2-letter EPC jump) — these EU funds are open to non-resident UK owners post-Brexit provided the property meets eligibility criteria.
ARENA Andalucía is the regional complementary programme, compatible with PRTR. After the renovation we re-issue the Spanish EPC with the new rating via our Junta de Andalucía qualified technician (cross-sell direct with /en/energy-certificate-malaga) — no additional coordination fee.
Between €27,000 and €90,000 depending on finish level and scope. Cosmetic renovation of a 90 sqm flat (paint, flooring, sanitary ware, micro-kitchen refresh) €27,000-€45,000. Mid-range full renovation (kitchen + bathrooms + services + windows) €45,000-€70,000.
High-end full renovation with home automation and aerothermal heating €70,000-€90,000. Spanish VAT excluded: 10% reduced for habitual residence, 21% general for commercial or secondary residence. Exact quote after free technical visit. May 2026.
Between 8 and 12 weeks of build time in standard conditions for a 90 sqm full renovation. If structural major works are involved (knocking down walls, changing layout, intervening facade) add 4-8 weeks of permit processing + stamped architect project before the first strike.
Cosmetic renovation without touching installations drops to 3-5 weeks. We plan by verifiable milestones with weekly site visits and photographic reports to the client. For non-resident owners we coordinate removals, temporary storage and visit scheduling.
Depends on scope. Obra menor (minor works · prior notification) when you do NOT affect structure, layout or facade — sufficient for paint, flooring, sanitary ware, kitchen and bathroom without moving walls. Fee €250-450 · resolved in 2-4 weeks.
Obra mayor (major works · permit with stamped architect project) when you intervene in structure, layout, facade or common areas. Fee €800-1,200 · resolved in 4-8 weeks.
We file the appropriate permit as part of the instruction at no additional cost. POA Hague Apostille used when the non-resident owner cannot sign in Spain.
Mandatory for major works under the Spanish Building Act (Ley de Ordenación de la Edificación 38/1999).
Any intervention in structure (beams, pillars, load-bearing walls), layout changes affecting structural walls, facade or roof modifications and works in common areas require a technical project signed by a Spanish-qualified architect (Arquitecto colegiado), stamped by the Architects College and on-site direction during the build.
NOT required for minor works. We work with colegiado architects we have collaborated with for years.
10% reduced VAT (IVA reducido) applies if the renovation is on the owner's habitual residence (Royal Decree-Law 20/2012): property built more than 2 years ago, owner's primary residence, and materials supplied by the contractor not exceeding 40% of the budget.
21% general VAT (IVA general) applies for commercial premises, second residence, holiday-let (VFT) property or when materials exceed 40%.
Declare the correct condition when signing the works contract to apply the reduced rate. Spanish NIE is required for contractor invoicing whether you are resident or not.
Yes if the renovation improves the property's energy performance. The PRTR (Plan de Recuperación, Transformación y Resiliencia) funded by Next Generation EU offers 40-80% subsidy for residential energy renovation.
Typical requirement: ≥2-letter EPC jump or ≥30% reduction in primary non-renewable energy consumption.
Post-Brexit UK owners remain eligible provided the Spanish property meets the criteria — funds attach to the property, not the owner's nationality.
ARENA Andalucía is the regional complementary programme, compatible with PRTR. We coordinate the application with the renovation and EPC re-issue. Rules current as of May 2026.
Three levels set by the Spanish Building Act 38/1999. 1 year on finishes (paint, flooring, tiling, minor furniture): snagging defects.
3 years on installations (plumbing, electrical, HVAC, sanitary ware): functional failures. 10 years on structural elements WHEN major works applied (beams, pillars, load-bearing walls, roof).
We formalise all three warranties in writing in the works contract. We respond as your single point of contact — we never defer to the responsible trade. Particularly valuable for non-resident UK/IE owners who cannot easily escalate to a Spanish trade from abroad.
A builder has an in-house crew and executes directly with their own operatives. A coordinator does NOT have a crew — contracts verified trades and supervises.
Coordinator advantages: specialist per category (kitchen by a kitchen fitter, not by a generalist mason), scheduling flexibility, absence of pressure to keep an in-house crew busy.
This is different from the UK refurb model where the main contractor IS the builder. We are an estate agency, not a builder — the coordinator model fits our natural role in the buy-sell-let cycle for British and Irish owners.
Yes — remote supervision is the most common scenario for our non-resident clients. We act as your on-the-ground project manager. We file permits with a Power of Attorney (POA) signed at any Spanish consulate and apostilled per the Hague Convention if signed outside Spain.
We send weekly written progress reports by email with photos and video where useful. Currency staged payments coordinated via TorFX, Currencies Direct, Wise, OFX or IFX for EUR/GBP milestone transfers. Visits during the build are entirely optional — you can come once at handover.
Yes, and it is most rentable if your property starts at E, F or G — common in Costa del Sol in pre-1990 properties (typical UK retiree purchase).
The measures with the best cost-to-letter return: double glazing with low-emissivity panes (€8,000-€15,000 for 100 sqm) — note that on Costa del Sol the cooling savings exceed the heating savings, unlike the UK heating-first economics; aerothermal heat pump (€6,000-€10,000) which on the cooling-heavy Costa del Sol climate is the best energy investment; and envelope insulation (€3,000-€8,000).
We coordinate the renovation with energy-improvement vision and re-issue the EPC with the new rating via our Junta de Andalucía qualified technician (cross-sell direct with /en/energy-certificate-malaga).
Free technical visit within 5-7 days + fixed-price written quote within 1-2 weeks. No visit fee. No commitment. Tell us about your property by phone, email or WhatsApp and we call back within 24 hours. 14-day cooling-off period applies. May 2026.
Phone
+34 123 456 789Area covered
Ciudad de Ejemplo · Provincia de Ejemplo
We coordinate residential renovations in Málaga, Torremolinos, Benalmádena, Fuengirola, Mijas, Marbella and Málaga city. We are NOT a builder.
We are property coordinators who deliver renovations with a verified Costa del Sol trade network, building permit management (obra menor minor works or obra mayor major works per scope), weekly remote supervision and Spanish-law contractual warranties 1/3/10 years (Ley de Ordenación de la Edificación 38/1999) formalised in writing.
We coordinate masonry, plumbing, electrical, HVAC, carpentry, painting, flooring, kitchens, bathrooms and home automation under a single bilingual point of contact — particularly valuable for non-resident UK/IE owners managing remotely.
For owners buying property to renovate (cross-sell with /en/buy-apartment-malaga) we coordinate the renovation from before completion with realistic target cost and timeline advisory.
For owners modernising habitual or secondary residence we execute in phases if you wish to remain in occupation — the typical UK retiree pre-1990 property scope (electrical rewiring + plumbing upgrade + insulation + double glazing + bathroom modernisation) is one of our most frequent instructions.
For flipping investors we coordinate the three phases of the cycle (buy · renovate · sell) under a single bilingual adviser within 6-9 months (cross-sell with /en/property-investment-costa-del-sol + /en/sell-apartment-costa-del-sol).
For BTL/VFT investors we renovate to lift the EPC rating and maximise long-term rental or holiday-let income (cross-sell with /en/rental-management-malaga + /en/holiday-rental-costa-del-sol + /en/apartment-rental-malaga).
Indicative costs as of May 2026: 90 sqm apartment cosmetic renovation €27,000-€45,000; mid-range full €45,000-€70,000; high-end full €70,000-€90,000. Spanish VAT excluded — 10% reduced applies for habitual residence, 21% general for commercial or secondary residence.
Typical timelines: kitchen 4-6 weeks, bathroom 1-2 weeks per unit, full 90 sqm flat 8-12 weeks, structural major works 14-20 weeks plus permit 4-8 weeks.
We advise on Next Generation EU PRTR funds (40-80% subsidy for residential energy improvements — post-Brexit UK owners remain eligible) and the ARENA Andalucía regional programme.
We re-issue the Spanish EPC with the new rating after the works via our Junta de Andalucía qualified technician (cross-sell with /en/energy-certificate-malaga).
Currency staged payments coordinated for non-resident milestone transfers via TorFX, Currencies Direct, Wise, OFX or IFX. POA Hague Apostille accepted for remote permit and contract signing.
Contractor liability insurance (Seguro Responsabilidad Civil) verified for every trade. 14-day cooling-off period applies per the Spanish General Consumer Defence Act. Bilingual Spanish/English service. Area served: Playamar, Torremolinos and the wider coast.